Nr

Design lead time

Customer

Design Description

1

Development of a working draft. 2008-2010г

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant.

Agglomeration factory with an agglomerate capacity of 350 thousand tons per year at the Aksu Ferroalloy Plant

2

Development of the detailed project, design monitoring
2009-2010

Zaporozhcran, PJSC, Ukraine
Company CONECRANES
Finland

Ukraine, Zaporozhcran PJSC,
Steel structure production modernization

3

Development of the detailed project, design monitoring, Expertise
2009-2010

РJSC ArcelorMittal Kryvyi Rih, Ukraine
Company Veleks
Kharkov

РJSC ArcelorMittal Kryvyi Rih,
Casting shop. Reconstruction of the gas purification unit.

4

Development of the detailed project and design monitoring
2010

Zaporozhstal, PJSC, Ukraine
Company EBNR ,
Austria

Ukraine, Zaporozhstal PJSC,
Cold rolling shop. Installation of coil annealing in hydrogen

5

Development of the detailed project and design monitoring
2010

Zaporozhstal, PJSC, Ukraine
Company EGES ,
Turkey

Casting shop.
Installation of furnaces and
casting machine

6

Development of the detailed project and design monitoring
2010

Zaporozhstal, PJSC, Ukraine
AIR LIQUIDE Company,
France

Oxygen compressor shop. Installation of the air separation unit of capacity 60 000 m3/h

7

Development of the detailed project and design monitoring
2010

ZAPOROZHCOKE, PJSC, Ukraine

Ukraine, Zaporozhcoke PJSC
Train of carbon loam granulation

8

Development of the detailed project and design monitoring
2010

РJSC ArcelorMittal Kryvyi Rih, Ukraine
Company Veleks,
Kharkov

Open-hearth shop. Reconstruction of the gas purification unit of mixer No. 2

9

Development of the detailed project and design monitoring
2010

РJSC ArcelorMittal Kryvyi Rih, Ukraine
National Metallurgical Academy of Ukraine

Sintering shop No. 3.
Facility of charge material.
Agglomerated cake production

10

Development of a working draft
2010-2011

The Republic of Kazakhstan.
TNC Kazchrome JSC.
Aksu Ferroalloy plant.

Gravity hot water pipelines of workshops No. 2 and No. 4 to СРS-1 of the Aksu Ferroalloy Plant

11

Development of the detailed project and design monitoring
2010-2011

Dneprospetsstal, PJSC, Ukraine
Siemens-VAI Company,
Austria

Ukraine, Dneprospetsstal PJSC, Installation of DSP-60 furnace with the gas purification unit

12

Development of the detailed project, design monitoring, Expertise
2010-2011

Dneprospetsstal, PJSC, Ukraine
Makina Company,
Turkey

Reconstruction of gas purifying system No. 3 electric steel-making shop

13

Development of the detailed project and design monitoring
2010-2011

Semi-conductor plant, PJSC, Ukraine
AIR LIQUIDE Company,
France

Semi-conductor plant PrJSC,
Hydrogen and oxygen station

14

Development of the detailed project and commissioning
2010-2011

Motor Sich, PJSC, Ukraine

Motor Sich PJSC
Liquid argon storage and gasification unit

15

Development of the detailed project and design monitoring.
2010-2012

The Republic of Kazakhstan.
Aksu Ferroalloy plant,
ZVVZ company,
Czech Republic

Reconstruction of gas treatment system of shop No. 4. Gas cleanings furnace No. 41, 45, 46

16

Development of the detailed project and design monitoring
2010-2012

Electrozavod, OJSC, Moscow,
All-Union Institute of Transformer building

Electrozavod OJSC
Pilot production of transformers and reactors

17

Development of the detailed project and design monitoring
2010-2012

KOLOROVI METALY LTD WITH FOREIGN INVESTMENTS, Ukraine

Gravity ore-processing plant

18

Development of the detailed project and design monitoring
2010-2012

Zaporozhye Cable Plant PJSC, Ukraine

Zaporozhye Cable Plant PJSC
Reconstruction

19

Development of the detailed project, design monitoring, Expertise 2011

Dneprospetsstal, PrJSC, Ukraine

Reconstruction of the recycling water supply of steelmaking and rolling shops

20

Development of the detailed project and design monitoring. 2011

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant.

Boiler house for Sintering plant.
Aksu Ferroalloy Plant

21

Development of the detailed project and design monitoring
2011

РJSC “ArcelorMittal Kryvyi Rih”, Ukraine
Ukrgipromez SE

Blast-furnace shop No. 1. Refractory preparation department. Reconstruction of aspiration system

22

Development of the detailed project
2011

Dneprometiz, PJSC. Ukraine

Modernization of steel-wire shop No. 2. Installation of the bell-type furnace

23

Development of the detailed project, design monitoring, Expertise 2011-2012

Dneprospetsstal PJSC, Ukraine
Aletig, LLC

Modernization of casting-form for ferromolybdenum production

24

Development of the detailed project and design monitoring
2011-2012

Ferrotreiding PrJSC, Ukraine
EKTA company, Moscow

Ferrotreiding PrJSC
Silicone Factory

25

Development of the detailed projects2011-2016

UKS Municipal Enterprise, Ukraine

Zaporozhye transport network modernization

26

Development of the detailed project and design monitoring
2012

Zaporozhstal, PJSC, Ukraine
Uralmash-metoborudovanie OJSC

Zaporozhstal, PJSC
Sintering plant.
Reconstruction of sinter machine No.1 with gas purification units

27

Development of working documentation.
2012

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant.

Reconstruction of ventilation, heating, heat and cold supply and air conditioning systems at the Business Center of TNK Kazchrome JSC

28

Development of the detailed project and design agreement
2012

Energoatom NAEK, Ukraine

Atomenergomash.
Reconstruction of protective cover production

29

Development of the detailed project
2012

Zaporozhstal, PJSC, Ukraine

Sixteen story house design

30

Development of the detailed project and design monitoring
2012-2013

Zaporozhstal, PJSC, Ukraine
AIR LIQUIDE Company
France

Cold rolling shop. Pickling line

31

Development of the detailed project.
2013

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant.

The department of drying chrome ore and coke for the sinter production.
Aksu Ferroalloy plant

32

Development of the feasibility Study documentation
2013

РJSC ArcelorMittal Kryvyi Rih, Ukraine

Crushing factory.
Reconstruction of aspiration systems

33

Development of the detailed engineering and turnkey project in cooperation with “Air Liquide”
2012

AIR LIQUIDE Company,
France

AIR LIQUIDE ENAKIEVO PrJSC,
Installation of VRU-1400 for the production of nitrogen and oxygen

34

Development of the detailed project and design monitoring
2013

RPA Dnipropress, PrJSC,
Metallurgical Academy of Ukraine

RPA Dnipropress PrJSC. Installation of the converter with a capacity of 15 tons in the steel-making shop

35

Development of the detailed project and design monitoring
2013

Zaporozhstal, PJSC, Ukraine

Cold rolling Shop. Reconstruction of the emulsion system of the Tandem mill

36

Development of the detailed project and design monitoring
2013

Zaporozhstal, PJSC, Ukraine
SOLWEY INDUSTRIS LTD

Blast shop. Dust blown fuel. Basic coal storage

37

Development of the detailed engineering 2013

TITANIUM INSTITUTE, PJSC, Ukraine

Ferronickel Production.
Republic of Guatemala

38

Development of the detailed project
2013

State-run enterprise Iskra, Ukraine

Plating shop. Installation of the zinc-platingline

39

Development of the detailed project
2013

Dneprosplav plant, LLC, Ukraine

Modernization of the ferrous and non-ferrous metals processing shop

40

Development of the detailed project
2013

Prosco Resources, LLC, Ukraine

Wet and chemical enrichment plant. Installation of centrifuges and vibrating screens

41

Development of the detailed project
2013

Cemkomplekt, LLC, Ukraine

Kryvyi Rih Thermal Power Station. Reconstruction of the ashremoval system out of the electric filters of 300MW powerunits

42

Development of the TEO documentation of the gas-turbine plant
2013

Motor Sich, PJSC, Ukraine

Gas turbine unit with a capacity of 2.5 MW with on low-calorie fuel

43

Development of the detailed project.
2013-2014

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aktobe Ferroalloy Plant.

Brecks production. Aktyubinsk Ferro-alloy plant

44

Correction of the detailed design
2014

ZAPOROZHCOKE, PJSC, Ukraine

Coal preparation department

45

Development of the detailed project
2013-2014

РJSC ArcelorMittal Kryvyi Rih, Ukraine

РJSC ArcelorMittal Kryvyi Rih. Reconstruction of sintering shop No. 2. Sinter machine No. 6.

46

Design and turnkey project in cooperation with RPE Dneproenergostal, LLC
2014

Zaporozhstal, PJSC, Ukraine

Zaporozhstal PJSC. Sintering shop. Reconstruction of gas cleaning sinter machine No. 2

47

Development of the detailed project and Expertise
2014

Tokmak Solar Energy, LLC, Ukraine

Solar power station 50 MW

48

Development of the detailed project and Expertise
2014

ZAPOROZHCOKE, PJSC, Ukraine

Coke shop. Reconstruction of the coke screening line

49

Development of the detailed project and design agreement
2014

ZAPOROZHCOKE, PJSC, Ukraine

Coke sorting. Reconstruction of the ventilation and aspiration system

50

Development of the detailed project
2014

ZAPOROZHCOKE, PJSC, Ukraine

Replacing heat exchangers

51

Development of the detailed project
2014

Maclife-Asu, LLC, Ukraine

Centroenergo PJSC. Tripolskaya Thermal Power Station. Installation of equipment for the selection of dry ash on 1 ÷ 4 blocks

52

Development of the detailed project and Expertise
2014

Ukrgrafit, PJSC, Ukraine

Reconstruction of Graphite substation 150/6 kV with the replacement of transformers

53

Development of the detailed project
2014

Zaporozhtransformator, PJSC, Ukraine

Modernization of the oil and oil waste treatment system

54

Design and turnkey project in cooperation with Progress Grupp LLC
2014-2015

Zaporozhstal, PJSC, Ukraine

Zaporozhstal OJSC. Agglomerative shop. Reconstruction of
gas cleaning units of sintering machines No. 3-6.

55

Development of the TEO documentation
2015

Ukrgrafit, PJSC, Ukraine

Railway routing and river port railway communication development

56

Development of the detailed project and design agreement
2015

Energy service, LLC, Ukraine

Kremenchug Thermal Power Station. Replacing TG-1excitation instead of the thyristor excitation system

57

Development of the detailed project and design agreement
2015

ABC Holding, LLC, Ukraine

Southwestern Railway. Modernization of the traction substation 110/27 / 11kV

58

Development of the detailed project and Expertise
2014-2016

EuroCape Ukraine LLC,
Vestas Ukraine, LLC

Wind park of capacity 500 MW on the area of Priazovskeand Melitopol district of Zaporozhye region

59

Development of the detailed project
2015

Zaporozhstal, PJSC, Ukraine

Zaporozhstal OJSC Conversion of hearths of sintering machines No. 2-6 to mixed gas

60

Development of the detailed project and design agreement
2015

Dneprospetsstal, PrJSC, Ukraine

Сonversion of thermal furnaces to natural gas

61

Development of the detailed project.
2015-2016

Metinvest Engineering, LLC, Ukraine

Reconstruction of the rail and structural department of AZOVSTAL IRON & STEEL WORKS.

62

Development of working documentation.
2015-2016

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant.

Development of design estimates and detailed engineering of equipment for the production of low-carbon ferrochrome by the mixing method in shop No 4 of the Aksu Ferroalloy Plant

63

Development of the detailed project. 2016 г.

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant.

Industrial gas cleaning facilities of furnace No. 44 of shop No. 4.
Aksu Ferroalloy Plant

64

Development of the detailed project.
2016

Kotloenergoproject HKP PrJSC, Ukraine

Installing the Thermal Power Station boiler

65

Development of the TEO documentation
2016

Dneprospetsstal, PrJSC,, Ukraine
Siemens-VAL Company
Austria

Reconstruction of the electric steel-smelting shop No 5 with the installation of VDP and VIP furnaces

66

Development of the TEO documentation
2016

Zaporizʹkyy Abrazyvnyy Kombinat, PrJSC, Ukraine

Reactive power compensation in plant networks

67

Development of the detailed project
2016

Plavmet, LLC, Ukraine

Modernization of the remelting of non-ferrous metals department

68

Development of the detailed project
2016

Zaporozhye machine-building design bureau progress state enterprise named after academician A.G.Ivchenko , Ukraine

Building No. 132. Conference rooms Reconstruction

69

Development of the detailed project
2016

Zaporozhye OblEnergo, OJSC, Ukraine

Expansion of Naberezhnaya substation 35/6 kV

70

Development of the detailed project and design agreement
2016

Tehnova Chernigov TPP PJSC, Ukraine

Replacement of thyristor excitation system instead of turbine generators motor-driven exciters

71

Implementation of supervision on the object.
2016-2017

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aktobe Ferroalloy Plant.

Object “Experimental industrial site for the production of breaks in the amount of 80 thousand tons per year by extrusion.

72

Development of the detailed project.
2016-2017

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant.

Development of design for the expansion of the building of the foundry span and No 1 shop of Aksu Ferroalloy plant

73

Development of the detailed project.
2017

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant.

Designing the 2nd stage of the GPP-2. Aksu Ferroalloy Plant

74

Development of the detailed project.
2017

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aktobe Ferroalloy Plant.

Construction of railway car defrosters, installation of gas infrared heating panels in a storage warehouse MV02 and installation of magnetic-pulse units in the drying department of raw materials MV04. Aktobe Ferroalloy Plant.

75

Development of the detailed project.
2016-2017

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant.

Reconstruction of gas cleanings furnaces No. 41-48 of shop No. 4. Gas cleanings furnace No. 42

76

Engineering design supervision
2017-2018

Zaporozhstal, PJSC, Ukraine

Zaporozhstal PJSC Agglomerative shop. Modernization of No. 1 sinter machine with the burners which use mixed gas

77

Development of the detailed project
2017-2018

Zaporozhye iron ore plant , PrJSC, Ukraine

Zaporozhye iron ore plant PrJSC
Crushing and screening plant. Tipple reconstruction. Replacing the existing GIT screens. Construction reinforcement

78

Development of the detailed project
2017-2018

Dneprospetsstal, PrJSC, Ukraine

Modernization of water control system

79

Development of the detailed project
2017-2018

RPE Dneproenergostal, LLC, Ukraine

PrAT Poltavskyi GZK . The crushers and concentrating factory. Constructions of a concentrate closed warehouse of a, a concentration unit, a building of a filtration with a compressor station, a shiping point of concentrate to railway cars and a system of pulp conduits

80

Development of the detailed project
2017-2018

Azovstal IRON AND STEEL WORKS, PrJSC, Ukraine

Rail and beam shop. Replacement of the thyristor converters of the drive of rolling motors of mill

81

Development of the detailed project
2017-2018

Metinvest Engineering, LLC, Ukraine

ILYICH IRON AND STEEL WORKS
Reconstruction of gas cleaning systems of sintering machines No 1-12 (sintering zone) and reconstruction of outdated gas cleaning systems of sintering machines No. 7-12 (cooling zone)

82

Engineering design supervision
2018

Metinvest Engineering LLC, Ukraine

ILYICH IRON AND STEEL WORKS
Reconstruction of gas cleaning systems of sintering machines No 1-12 (sintering zone) and reconstruction of outdated gas cleaning systems of sintering machines No. 7-12 (cooling zone)

83

Development of the detailed project
2018

Metinvest Engineering, LLC, Ukraine

ILYICH IRON AND STEEL WORKS
Reconstruction of roughing stands in 1700 hot strip mill

84

Development of the detailed project
2017-2018

MIKEM, LLC, Ukraine

Zaporozhstal PJSC
Oxygen compressor shop. Automatic throttle control system for six K-1500 compressors and a device for K-500 compressor No. 13. Modernization

85

Development of the detailed project
2018

Zaporozhye Cable Plant, PrJSC, Ukraine

Zaporozhye Cable Plant, PrJSC, Production modernization. Organization of production of self-supporting insulated wires in the Common Use Center No.121

86

Development of the detailed project
2018

Dnepropress steel, LLC, Ukraine

Steel shop. The installation of induction furnaces and the converter. Reconstruction.

87

Development of the detailed project
2018

Dnepropress steel, LLC, Ukraine

Steel shop. Restored furnace DSPPT-12 and GKR-15 converter. Reconstruction

88

Engineering design supervision
2018-2019

Metinvest Engineering, LLC

Detailed design of the project Reconstruction of roughing stands in 1700 hot strip mill.
ILYICH IRON AND STEEL WORKS

89

Development of the detailed project.
2018-2019

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant

Reconstruction of gas cleanings furnaces of No. 41-48 of shop No. 4. Gas cleaning furnace No. 43. Aksu Ferroalloy plant

90

Design supervision.
2018-2019

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aktobe Ferroalloy plant

Engineering design supervision. Construction of car-freezers, installation of gas panels of infrared heating in the storage warehouse MV02 and installation of magnetic-pulse production plants in the drying department of raw materials MV04. Aktobe Ferroalloy Plant.

91

Development of the detailed project.
2019

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant

Design estimate documentation for the installation of ferroalloy gas heating ladle in No6 smelting shop on furnaces which producing high-carbon ferrochrome.

92

Design supervision.
2019

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant

Expansion of the building of the foundry span and SHP of workshop No. 1

93

Detailed project
2019

Metinvest Engineering, LLC,
Termokimik Corporation, Ukraine

Development of sections of the project documentation for the stage Working documentation for desulfurization facilities of sinter block No. 1 of sintering machines no. 1-6 of the cooling zone as part of the project“ reconstruction of gas cleaning systems of sintering machines no. 1-12 (sintering zone) and reconstruction of obsolete gas cleaning systems of sintering machines No. 7- 12 (cooling zone)/ ILYICH IRON AND STEEL WORKS

94

Settlement services.
2019

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloy plant

Calculation of the bearing capacity of the columns of axes 34 and 37 in series B of workshop No. 1 Aksu Ferroalloy plant.

95

Engineering design supervision
2019

Metinvest Engineering, LLC, Ukraine

Reconstruction of gas cleaning systems for sinter machines No. 1-6 of the cooling zone, as part of the project “Reconstruction of gas cleaning systems for sinter machines No. 1-12 (sintering zone) and reconstruction of obsolete gas cleaning systems for sinter machines No. 7-12. ILYICH IRON AND STEEL WORKS

96

Development of sections “Project” and “Working documentation”, 2019

Metinvest Engineering, LLC,
Primetals Technologies, Ukraine

Development of sections of project documentation for the Project and Work documentation stages as part of the project Reconstruction of roughing stands in 1700 hot strip mill.
New calendar plan. ILYICH IRON AND STEEL WORKS

97

Engineering design supervision,
2019

Metinvest Engineering, LLC, Ukraine

Architectural supervision of construction and installation works (sections of the Working Documentation) in according to the project Reconstruction of roughing stands in 1700 hot strip mill.
ILYICH IRON AND STEEL WORKS

98

Development of sections of the project, 2019

Metinvest Engineering, LLC, Ukraine

Work on the development of design estimates for the Project stage in the sections: “Energy supply”, “Number of jobs and their equipment, total number of employees”, “Architectural and construction solutions”, “Engineering protection of territories and objects”, “Labor protection”, “Water supply and drainage”, “Fire safety”, “Engineering and technical measures of civil protection (civil defense)”, “Hydraulics and lubrication systems”, “Waste management ”, “Heating, ventilation and air conditioning”, “Ensuring reliability and safety spine of construction projects”, “Communication systems and industrial television”, “Identification of high-risk” in the framework of the project” Construction of hydraulic winder at the
ILYICH IRON AND STEEL WORKS

99

Development of the detailed project, 2019

UKRGRAFIT, PJSC, Ukraine

Implementation of the detailed design:
“Building construction for the installation of an extractive gas analyzer unit for continuous monitoring of exhaust gases,
Severnoe shosse St., 20, Zaporozhye UKRGRAFIT PJSC

100

Engineering design supervision,
2019

Zaporozhye machine-building design bureau Progress state enterprise named after academician A.G.Ivchenko, Ukraine

Implementation of the facility supervision. Overhaul of the facade of building No.132 with insulation

101

Engineering design supervision
2019,

ZAPOROZHCOKE, PJSC, Ukraine

Implementation of the facility supervision. ZAPOROZHKOKE PJSC. Resin distillation workshop. Pitch granulation department No. 2. New construction. Extension of the term of Implementation of the supervision.

102

Development of the detailed project, 2019

Municipal enterprise Management of capital construction, Ukraine

Implementation of a working project at the facility: “Reconstruction of the sewer collector to KNS-1 by vul. Ukrainska, Zaporizhzhia (correction)”.

103

Engineering design supervision
2019

Metinvest Engineering, LLC, Ukraine

Architectural supervision of construction and installation works (sections of the Working documentation) “Architectural and construction part”, “Energy systems of water supply and sanitation, heating, ventilation and air conditioning systems”, “Electrical part, fire and security alarms” as part of the project “Reconstruction sinter gas cleaning systems No. 1-12 (sintering zone) and reconstruction of obsolete sinter gas cleaning systems No. 7-12 (cooling zone). ILYICH IRON AND STEEL WORKS

104

Development of the detailed project and design documentation,
Inspection, assessment of technical condition.
2019

TITANIUM INSTITUTE, PJSC, Ukraine

Implementation of the project and working documentation of the master plan and transport (GPT), urban planning calculation for the facility: ALOINS LLC. Reconstruction of the finished goods warehouse in Zaporozhzhia on the vul. Teplichna, 7.
Survey, assessment of the technical condition and operational suitability of the foundations of the stock of charge materials: ALOINS LLC Reconstruction of the charge warehouse and finished products for the charge preparation workshop.

105

Development of the detailed project, 2019

Dnepropress steel, LLC, Ukraine

Steel shop. Installation of the DSPPT-12 furnace and GKR-15 converter. Technical re-equipment.

106

Development of the detailed project, 2019

Dnepropress steel, LLC, Ukraine

Steel shop. Installation of induction furnaces OIP-1,0, OIP-1,5 and converter GKR-2.5.

107

Development of the detailed project, 2019

Ferroks, LLC, Ukraine

Implementation of a working draft for the reconstruction of the smelter of Ferroks LLC, vul. Pivdenne shose, 59, Zaporizhzhia

108

Calculation and design documentation

PRACTICER, LLC , Ukraine

Calculation and design documentation for brittle coupling for aerodrome signs

109

Design documentation , 2019

Zaporizhzhya Iron Ore Plant PJSC, Ukraine

Zaporizhzhya Iron Ore Plant PJSC.
The Tipple building. Installation of the elevator on the GS-2. Working documentation

110

Development of design estimates, 2019

Financing of infrastructure projects SE, Ukraine

GBN G.1-218-182: 2011 “Overhaul of traffic interchange at the same level of ring type with a small diameter of the central aria on national road M-18 Kharkiv-Simferopol-Alushta-Yalta on the km 263+120, Zaporizhzhia region” (development of design and estimate documentation for the overhaul of roads, engineering structures and its examination) (code DK 021: 2015 (45000000-7 – Construction work and current repair)

111

Development of the design documentation, 2019

Financing of infrastructure projects SE, Ukraine

GBN G.1-218-182: 2011 “Overhaul of transport interchange at the same ring type with the average diameter of the central aria on national road N-30 Vasylivka-Berdyansk on the section km 39+166, Zaporizhzhia region” (Development of design estimates for the overhaul of roads, engineering structures and its examination)

112

Development of the design documentation, 2019

Financing of infrastructure projects SE, Ukraine

GBN G.1-218-182: 2011 “Overhaul of traffic interchange at the same level of ring type with a small diameter of the central aria on national road M-18 Kharkiv-Simferopol-Alushta-Yalta on the km 376+866, Zaporizhzhia region” (development of design estimates for the overhaul of roads, engineering structures and its examination)

113

Development of the design documentation, 2019

Financing of infrastructure projects SE, Ukraine

GBN G.1-218-182: 2011 “Overhaul of transport interchange at the same level of ring type with a small diameter of the central aria on national road R-37 Energodar-Vasylivka on the section km 13+940, Zaporizhzhia region” (Development of design estimates for the overhaul of roads, engineering structures and its examination)

114

Inspection and assessment of technical condition, 2019

Metinvest Engineering, LLC, Ukraine

Inspection and assessment of the technical condition of the existing foundations of VRU-60 booster-compressors as a part of the project “Construction of hot-rolled coils production” in Zaporozhye, Yuzhnoe shosse St., 72

115

Development of the detailed project, 2019

PJSC Zaporozhye Cable Plant, Ukraine

PJSC Zaporozhye Cable Plant. Production modernization. Organization of production of self-supporting insulated wires in the Common Use Center No. 121

116

Development of the detailed project, 2019-2020

Metinvest Engineering, LLC, Ukraine

Development of the detailed project for desulfurization facilities of sinter casing No. 1 of sinter machines No. 1-6 of the cooling zone for the project Reconstruction of gas cleaning systems of sinter machines No. 1-12 (sintering zone) and reconstruction of outdated gas cleaning systems of sinter machines No. 7-12 (cooling zone) at PJSC ILYICH IRON AND STEEL WORKS

117

Development of the detailed project, 2019-2020

PJSC Zaporozhye iron ore plant, Ukraine

PJSC Zaporozhye iron ore plant.
The Tipple building. Installation of an elevator at GS-2.
/p>

118

Development of detailed structural steel drawings, 2019-2020

Metinvest Engineering, LLC, Ukraine

Development of detailed structural steel drawings for desulfurization facilities sinter casing No. 1 of sinter machines No. 1-6 cooling zones of the stage Development of the detailed project for the project Reconstruction of gas cleaning systems for sintering machines No. 1-12 (sintering zone) and reconstruction of outdated gas cleaning systems for sintering machines No. 7-12 (zone cooling) at PJSC ILYICH IRON AND STEEL WORKS

119

Design estimate documentation and
development of the detailed project, 2019-2020

Metinvest Engineering, LLC, Ukraine

Development of design and estimate documentation for the project Construction of a hydraulic coiler in 1700 hot strip mill of PJSC ILYICH IRON AND STEEL WORKS in Mariupol, Levchenko st., 1

120

Development and adaptation of an investment project, 2020

The Republic of Kazakhstan, JSC ArcelorMittal Temirtau

JSC ArcelorMittal Temirtau,
Development and adaptation of the investment project DTs. DP-3. Reconstruction of air heater No. 9

121

Development of the project, 2019

The Republic of Kazakhstan. JSC TNC Kazchrome.
Aksu Ferroalloy plant.

Aksu Ferroalloy Plant – a branch of JSC TNK Kazchrome
Development of the project
Insulation of the jigging complex with the installation of heat pumps for heating the circulating water from the cooling elements of the melting furnaces of shop No. 1

122

Design estimate documentation

LLC ERG Recycling
The Republic of Kazakhstan

The Republic of Kazakhstan, Pavlodar region, Aksu-1, Aksu ferroalloy plant as a branch of the JSC TNK Kazchrome,
Design and estimate documentation for the construction of a jigging complex for ferrochrome slag processing

123

Design estimate documentation 2021

TsentrEnergoAlliance LLC

No. 1 Smelting shop. Reconstruction. Installation of 22 MVA ore-thermal electric furnace RKO-22FKh-I2 of Aktobe Ferroalloys Plant, which is a branch of TNK Kazchrome JSC

124

Engineering design supervision
2021

The Republic of Kazakhstan. TNC Kazchrome JSC

Supervision of the desing project: Jigging complex insulation with the heat pumps installation for heating by circulating water from the cooling elements of smelting furnaces of shop No. 1 of the Aksu Ferroalloys Plant which is a branch of TNK Kazchrome JSC.

125

Design estimate documentation 2021

The Republic of Kazakhstan. TNC Kazchrome JSC

Development of design and estimate documentation for the project “Sector of ladle lining with carbon raw materials for the Aksu Ferroalloys Plant which is a branch of TNK Kazchrome JSC

126

Engineering design supervision,
2020

Mistsevi dorohy Zaporizkoi oblasti
State Enterprise

Supervision during construction work performance of the object:
Overhaul of С080201 / М-18 / road – Stepnohirsk city, overpass across the road, 0 + 200 km
(71247000-1 supervision of building and construction works)

127

Project development,
2020

Vodokanal
Public utility company

Work execution according to Code DK 021: 2015 45220000-5 Engineering and construction work (project development and obtaining a positive report from expert by the project “Reconstruction of a water conduit from DVS-1 to s. Liutserna, Vilniansk raion, Zaporizhzhia oblast)

128

Development of the design documentation,
2020

Metinvest Engineering, LLC, Ukraine

Work execution of design documentation for three stages: concept of design, design development, detailed documentation within the project: “Reconstruction of the aspiration system of the stock house of the skip pit and bell-less top of No. 4 blast furnace PJSC “AZOVSTAL IRON & STEEL WORKS”

129

Engineering design supervision,
2020

Metinvest Engineering, LLC, Ukraine

Supervision of engineering and construction work according to detailed documentation of the project: “Reconstruction of the aspiration system of the stock house of the skip pit and bell-less top of No. 4 blast furnace PJSC “AZOVSTAL IRON & STEEL WORKS” at address Leporskogo st. 1, Mariupol city

130

Correction of design documentation,
2021

Capital construction management
Public utility company

Correction of the design documentation for the object: Reconstruction of the chlorination plant of DVS-2, Zaporizhzhia city (second stage, correction)

131

Development of design documentation, 2021

ZAPORIZHZHIA MACHINE-BUILDING DESIGN BUREAU PROGRESS STATE ENTERPRISE NAMED AFTER ACADEMICIAN O.H.IVCHENKO

Development of design documentation for overhaul of the facade with insulation of No. 132 building in axes U-A, axis 1/5 (south side) at the address Ivanova st. 2, Zaporizhzhia city

132

Engineering services,
2021

Mykolaiv Alumina Plant TOV

“Calcination sector. Technical re-equipment of the gas cleaning system at the unit KS-1 “Lurgi” of Mykolaiv Alumina Plant TOV at address vul. Naberezhna, bud. 64, s. Halytsynove, Vitovka raion, Mykolaivska obl.”(service code – 71.12.1 Engineering services)

133

Engineering design supervision,
2021

Mykolaiv Alumina Plant TOV

Supervision by the construction of the facility: “Calcination sector. Technical re-equipment of the gas cleaning system at the unit KS-1 “Lurgi” of Mykolaiv Alumina Plant TOV at address vul. Naberezhna, bud. 64, s. Halytsynove, Vitovka raion, Mykolaivska obl.”

134

Detailed documentation development,
2021

Mykolaiv Alumina Plant TOV

Development of detailed documentation for the project: “Construction of a new storage pond with a pumping station as a part of the technical re-equipment of slime facility with the transition to a new dry storage technology of red mud filter cake of Mykolaiv Alumina Plant TOV at address vul. Naberezhna, bud. 64, s. Halytsynove, Vitovka raion, Mykolaivska obl.”. Correction. Relocation of structures and networks from the construction zone

135

Detailed documentation development,
2021

Mykolaiv Alumina Plant TOV

Development of detailed documentation for the project: “Construction of a new storage pond with a pumping station as a part of the technical re-equipment of slime facility with the transition to a new dry storage technology of red mud filter cake of Mykolaiv Alumina Plant TOV at address vul. Naberezhna, bud. 6, s. Halytsynove, Vitovka raion, Mykolaivska obl.”. Correction. Relocation of structures and networks from the construction zone. Additional development of detailed documentation for the on-site road

136

Engineering design supervision,
2021

‘Mariupolavtodor’ Commercial Public Utility

Supervision of the overhaul of road network on Stroiteley Ave from Mira Ave to Black Sea alley in Mariupol city

137

Correction of design documentation,
2021

Capital Construction Management
Public utility company

Correction of the design documentation for the object: “Reconstruction of the chlorination plant of DVS-2, Zaporizhzhia city” (second stage, the correction) Change of particulars and amount of finance

138

Inspection of structures

Capital Construction Management
Public utility company

Inspection of span structures for the object: “Reconstruction of span structures of Voznesenovsky spusk (Leninsky Komsomol) causeway on Pobedy st. to Yatsenko st. in Zaporozhye

139

Development of the project,
2021

Capital Construction Management
Public utility company

Reconstruction of under-bridge span structures of Voznesenovsky spusk (Leninsky Komsomol) causeway on Pobedy st. to Yatsenko st. in Zaporozhye. Adjustment

140

Engineering design supervision,
2021

Metinvest Engineering, LLC, Ukraine

Supervision of the project: “Reconstruction of the aspiration system of the stock house of the skip pit and bell-less top of No. 4 blast furnace PJSC “AZOVSTAL IRON & STEEL WORKS” on the Leporskogo st. 1, Mariupol city

141

Design estimate documentation, 2021

METSPLAV TD LLC

Design development stage for the object: Reconstruction. Installation of an induction furnace for smelting steel and other alloys. Production Company DNIPRO WORKS OF METAL ALLOYS LLC at address industrial site of the mine 11, Stepnohirsk city, Zaporizhzhia oblast, Ukraine

142

Design estimate documentation, 2021

Melitopol turbo compressor plant LLC

Design development stage for the object: Span reconstruction in axies B-V of the reinforcement shop into the foundry of casting according to gasifiable patterns of Melitopol turbo compressor plant LLC, Kakhovske shose st. 20a, Melitopol city

143

Development of the design documentation,
2021

Poltava mining and refining plant
Private Joint Stock Company

Development of design documentation for the loading unit of conveyors which are working directly into the drum pelletizer. Design documentation

144

Development of the detailed project,
2021

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloys plant

TNK Kazchrome JSC. Aksu Ferro-Alloys Plant. Power shop of Aksu Ferro-Alloys Plant. Reconstruction of filter station No. 2 with replacement of coarse filters. Detail design

145

Design estimate documentation, 2021

The Republic of Kazakhstan. TNC Kazchrome JSC.
Aksu Ferroalloys plant

Development of design and estimate documentation for the project “Section of lining ladles with carbonaceous materials for Aksu Ferroalloys Plant which is a branch of TNK Kazchrome JSC”

146

Design estimate documentation, 2021

TsentrEnergoAlliance, LLC

Development of design and estimate documentation for the object: Smelting shop No. 1. Reconstruction. Installation of 22 MVA capacity ore-thermal electric furnace RKO-22FKh-I2 of Aktobe Ferroalloys Plant as a branch of TNK Kazchrome JSC

147

Development of the detailed project,
2021

Metinvest Engineering, LLC, Ukraine

Development of detailed documentation “New construction for the production of cold-rolled products at PJSC ILYICH IRON AND STEEL WORKS at address Levchenko st. 1, Mariupol city. Construction stage No.1 (CS-1). AMKOM-1 installation translocation”

148

Development
of the design documentation, 2021

The Republic of Kazakhstan.
TNC Kazchrome JSC.
Aksu Ferroalloy plant

Energy shop. Reconstruction of the filter station No. 2 with the replacement of coarse filters. Aksu Ferroalloy plant

149

Development
of the design documentation, 2021-2022

The Republic of Kazakhstan.
TSENTRENERGOALJANS LP

Smelting workshop No. 1. Reconstruction. Replacement of furnace No. 12. Installation of ore-thermal electric furnace RKO-22FKh-I2 with a capacity of 22 MVA.
Aktobe Ferroalloy Plant