Reference list of design works of LLC LDI HIPROPROM over the past 10 years

Nr Design lead time Customer Design Description
1 Development of a working draft. 2008-2010г The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant.

Agglomeration factory with an agglomerate capacity of 350 thousand tons per year at the Aksu Ferroalloy Plant
2 Development of the detailed project, design monitoring

2009-2010

Zaporozhcran, PJSC, Ukraine

Company CONECRANES

Finland

Ukraine, Zaporozhcran PJSC,

Steel structure production modernization

3 Development of the detailed project, design monitoring, Expertise

2009-2010

РJSC ArcelorMittal Kryvyi Rih, Ukraine

Company Veleks

Kharkov

РJSC ArcelorMittal Kryvyi Rih,

Casting shop. Reconstruction of the gas purification unit.

4 Development of the detailed project and design monitoring

2010

Zaporozhstal, PJSC, Ukraine

Company EBNR ,

Austria

Ukraine, Zaporozhstal PJSC,

Cold rolling shop. Installation of coil annealing in hydrogen

5 Development of the detailed project and design monitoring

2010

Zaporozhstal, PJSC, Ukraine

Company EGES ,

Turkey

Casting shop.

Installation of furnaces and

casting machine

6 Development of the detailed project and design monitoring

2010

Zaporozhstal, PJSC, Ukraine

AIR LIQUIDE Company,

France

Oxygen compressor shop. Installation  of the air separation unit of capacity 60 000 m3/h
7 Development of the detailed project and design monitoring

2010

ZAPOROZHCOKE, PJSC, Ukraine Ukraine, Zaporozhcoke PJSC

Train of carbon loam granulation

8 Development of the detailed project and design monitoring

2010

РJSC ArcelorMittal Kryvyi Rih, Ukraine

Company Veleks,

Kharkov

Open-hearth shop. Reconstruction of the gas purification unit of mixer No 2
9 Development of the detailed project and design monitoring

2010

РJSC ArcelorMittal Kryvyi Rih, Ukraine

National Metallurgical Academy of Ukraine

Sintering shop No 3.

Facility of charge material.

Agglomerated cake production

10 Development of a working draft of gravity.

2010-2011

The Republic of Kazakhstan.

TNC Kazchrome JSC.

Aksu Ferroalloy plant.

Gravity hot water pipelines of workshops No. 2 and No. 4 to СРS-1 of the Aksu Ferroalloy Plant
11 Development of the detailed project and design monitoring

2010-2011

Dneprospetsstal, PJSC, Ukraine

Siemens-VAI Company,

Austria

Ukraine, Dneprospetsstal PJSC, Installation of DSP-60 furnace with the gas purification unit
12 Development of the detailed project, design monitoring, Expertise

2010-2011

Dneprospetsstal, PJSC, Ukraine

Makina Company,

Turkey

Reconstruction of gas purifying system No 3 electric steel-making shop
13 Development of the detailed project and design monitoring

2010-2011

Semi-conductor plant, PJSC, Ukraine

AIR LIQUIDE Company,

France

Semi-conductor plant PrJSC,

Hydrogen and oxygen station

14 Development of the detailed project and commissioning

2010-2011

Motor Sich, PJSC, Ukraine Motor Sich PJSC

Liquid argon storage and gasification unit

15 Development of the detailed project and design monitoring.

2010-2012

The Republic of Kazakhstan.

Aksu Ferroalloy plant,

ZVVZ company,

Czech Republic

Reconstruction of gas treatment system of shop No4.  Gas cleanings furnace No 41, 45, 46
16 Development of the detailed project and design monitoring

2010-2012

Electrozavod, OJSC, Moscow,

All-Union Institute of Transformer building

Electrozavod OJSC

Pilot production of transformers and reactors

17 Development of the detailed project and design monitoring

2010-2012

KOLOROVI METALY LTD WITH FOREIGN INVESTMENTS,  Ukraine

 

Gravity ore-processing plant
18 Development of the detailed project and design monitoring

2010-2012

Zaporozhye Cable Plant,PJSC,  Ukraine Zaporozhye Cable Plant PJSC

Reconstruction

19 Development of the detailed project, design monitoring, Expertise 2011 Dneprospetsstal, PrJSC,  Ukraine Reconstruction of the recycling water supply of steelmaking and rolling shops
20 Development of the detailed project and design monitoring. 2011 The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant.

Boiler house for Sintering plant.

Aksu Ferroalloy Plant

21 Development of the detailed project and design monitoring

2011

РJSC “ArcelorMittal Kryvyi Rih”,  Ukraine

Ukrgipromez SE

Blast-furnace shop No 1. Refractory preparation department. Reconstruction of aspiration system
22 Development of the detailed project

2011

Dneprometiz, PJSC.  Ukraine Modernization of steel-wire shop No 2.  Installation of the bell-type furnace
23 Development of the detailed project, design monitoring, Expertise 2011-2012 Dneprospetsstal PJSC,  Ukraine

Aletig, LLC

Modernization of casting-form for ferromolybdenum production
24 Development of the detailed project and design monitoring

2011-2012

Ferrotreiding PrJSC,  Ukraine

EKTA company, Moscow

Ferrotreiding PrJSC

Silicone Factory

25 Development of the detailed projects2011-2016 UKS Municipal Enterprise,  Ukraine Zaporozhye transport network modernization
26 Development of the detailed project and design monitoring

2012

Zaporozhstal, PJSC,   Ukraine

Uralmash-metoborudovanie OJSC

Zaporozhstal, PJSC

Sintering plant.

Reconstruction of sinter machine No1 with gas purification units

27 Development of working documentation.

2012

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant.

Reconstruction of ventilation, heating, heat and cold supply and air conditioning systems at the Business Center of TNK Kazchrome JSC
28 Development of the detailed project and design agreement

2012

Energoatom NAEK,  Ukraine Atomenergomash.

Reconstruction of protective cover production

29 Development of the detailed project

2012

Zaporozhstal, PJSC,  Ukraine Sixteen story house design
30 Development of the detailed project and design monitoring

2012-2013

Zaporozhstal, PJSC,  Ukraine

AIR LIQUIDE Company

France

Cold rolling shop. Pickling line

 

31 Development of the detailed project.

2013

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant.

The department of drying chrome ore and coke for the sinter production.

Aksu Ferroalloy plant

32 Development of the feasibility Study documentation

2013

РJSC ArcelorMittal Kryvyi Rih, Ukraine Crushing factory.

Reconstruction of aspiration systems

33 Development of the detailed engineering and turnkey project in cooperation with “Air Liquide”

2012

AIR LIQUIDE Company,

France

AIR LIQUIDE ENAKIEVO PrJSC,

Installation of VRU-1400 for the production of nitrogen and oxygen

34 Development of the detailed project and design monitoring

2013

RPA Dnipropress, PrJSC,

Metallurgical Academy of Ukraine

RPA Dnipropress, PrJSC. Installation of the converter with a capacity of 15 tons in the steel-making shop
35 Development of the detailed project and design monitoring

2013

Zaporozhstal, PJSC,  Ukraine Cold rolling Shop. Reconstruction of the emulsion system of the Tandem mill
36 Development of the detailed project and design monitoring

2013

Zaporozhstal, PJSC,  Ukraine

SOLWEY INDUSTRIS LTD

Blast shop. Dust blown fuel. Basic coal storage
37 Development of the detailed engineering 2013  TITANIUM INSTITUTE, PJSC,  Ukraine

 

Ferronickel Production.

Republic of Guatemala

38 Development of the detailed project

2013

State-run enterprise Iskra,  Ukraine Plating shop. Installation of the zinc-platingline
39 Development of the detailed project

2013

Dneprosplav plant, LLC,  Ukraine Modernization of the ferrous and non-ferrous metals processing shop
40 Development of the detailed project

2013

Prosco Resources, LLC,  Ukraine Wet and chemical enrichment plant. Installation of centrifuges and vibrating screens
41 Development of the detailed project

2013

Cemkomplekt,  LLC,  Ukraine Kryvyi Rih Thermal Power Station. Reconstruction of the ashremoval system out of the electric filters of 300MW powerunits

 

42 Development of the TEO documentation of the gas-turbine plant

2013

Motor Sich, PJSC,  Ukraine Gas turbine unit with a capacity of 2.5 MW with on low-calorie fuel
43 Development of the detailed project.

2013-2014

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aktobe Ferroalloy Plant.

Brecks production. Aktyubinsk Ferro-alloy plant
44 Correction of the detailed design

2014

ZAPOROZHCOKE, PJSC,  Ukraine Coal preparation department
45 Development of the detailed project

2013-2014

РJSC ArcelorMittal Kryvyi Rih,  Ukraine РJSC ArcelorMittal Kryvyi Rih. Reconstruction of sintering shop No 2. Sinter machine No 6.
46 Design and turnkey project in cooperation with RPE Dneproenergostal, LLC

2014

Zaporozhstal, PJSC,  Ukraine Zaporozhstal PJSC. Sintering shop. Reconstruction of gas cleaning sinter machine No. 2
47 Development of the detailed project and Expertise

2014

Tokmak Solar Energy, LLC,  Ukraine Solar power station 50 MW
48 Development of the detailed project and Expertise

2014

ZAPOROZHCOKE, PJSC,  Ukraine Coke shop. Reconstruction of the coke screening line
49 Development of the detailed project and design agreement

2014

ZAPOROZHCOKE, PJSC,  Ukraine Coke sorting. Reconstruction of the ventilation and aspiration system
50 Development of the detailed project

2014

ZAPOROZHCOKE, PJSC,  Ukraine Replacing heat exchangers
51 Development of the detailed project

2014

Maclife-Asu, LLC,  Ukraine Centroenergo PJSC. Tripolskaya  Thermal Power Station. Installation of equipment for the selection of dry ash on 1 ÷ 4 blocks
52 Development of the detailed project and Expertise

2014

Ukrgrafit, PJSC,  Ukraine Reconstruction of Graphite substation 150/6 kV with the replacement of transformers
53 Development of the detailed project

2014

Zaporozhtransformator, PJSC,  Ukraine Modernization of the oil and oil waste treatment system
54 Design and turnkey project in cooperation with Progress Grupp LLC

2014-2015

Zaporozhstal, PJSC,  Ukraine Zaporozhstal OJSC. Agglomerative shop. Reconstruction of

gas cleaning units of sintering machines No 3-6.

55 Development of the TEO documentation

2015

Ukrgrafit, PJSC,  Ukraine Railway routing and river port railway communication development
56 Development of the detailed project and design agreement

2015

Energy service, LLC, Ukraine Kremenchug  Thermal Power Station. Replacing TG-1excitation  instead of the thyristor excitation system
57 Development of the detailed project and design agreement

2015

ABC Holding, LLC, Ukraine Southwestern Railway. Modernization of the traction substation 110/27 / 11kV
58 Development of the detailed project and  Expertise

2014-2016

EuroCape Ukraine LLC,

Vestas Ukraine, LLC

Wind park of capacity 500 MW on the area of Priazovskeand Melitopol district of Zaporozhye region
59 Development of the detailed project

2015

Zaporozhstal, PJSC, Ukraine Zaporozhstal OJSC Conversion of hearths of sintering machines No 2-6 to mixed gas
60 Development of the detailed project and design agreement

2015

Dneprospetsstal, PrJSC, Ukraine Сonversion of thermal furnaces to natural gas
61 Development of the detailed project.

2015-2016

Metinvest Engineering, LLC, Ukraine Reconstruction of the rail and structural department of AZOVSTAL IRON & STEEL WORKS.
62 Development of working documentation.

2015-2016

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant.

Development of design estimates and detailed engineering of equipment for the production of low-carbon ferrochrome by the mixing method in shop No 4 of the Aksu Ferroalloy Plant
63 Development of the detailed project. 2016 г. The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant.

Industrial gas cleaning facilities of furnace No 44  of shop No4.

Aksu Ferroalloy Plant

64 Development of the detailed project.

2016

Kotloenergoproject HKP PrJSC, Ukraine

 

Installing the  Thermal Power Station  boiler
65 Development of the TEO documentation

2016

Dneprospetsstal, PrJSC,, Ukraine

Siemens-VAL Company

Austria

Reconstruction of the electric steel-smelting shop No 5 with the installation of VDP and VIP furnaces
66 Development of the TEO documentation

2016

Zaporizʹkyy Abrazyvnyy Kombinat, PrJSC, Ukraine Reactive power compensation in plant networks
67 Development of the detailed project

2016

Plavmet, LLC, Ukraine Modernization  of the remelting of non-ferrous metals department
68 Development of the detailed project

2016

Zaporozhye machine-building design bureau progress state enterprise named after academician A.G.Ivchenko , Ukraine Building No132. Conference rooms Reconstruction
69 Development of the detailed project

2016

Zaporozhye OblEnergo, OJSC, Ukraine Expansion of Naberezhnaya substation  35/6 kV
70 Development of the detailed project and design agreement

2016

Tehnova Chernigov TPP PJSC, Ukraine Replacement of thyristor excitation system instead of turbine generators motor-driven exciters
71 Implementation of supervision on the object.

2016-2017

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aktobe Ferroalloy Plant.

Object “Experimental industrial site for the production of breaks in the amount of 80 thousand tons per year by extrusion.
72 Development of the detailed project.

2016-2017

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant.

Development of design for the expansion of the building of the foundry span and No 1 shop of Aksu Ferroalloy plant
73 Development of the detailed project.

2017

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant.

Designing the 2nd stage of the GPP-2. Aksu Ferroalloy Plant
74 Development of the detailed project.

2017

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aktobe Ferroalloy Plant.

Construction of railway car defrosters, installation of gas infrared heating panels in a storage warehouse MV02 and installation of magnetic-pulse units in the drying department of raw materials MV04. Aktobe Ferroalloy Plant.
75 Development of the detailed project.

2016-2017

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant.

Reconstruction of gas cleanings furnaces No 41-48 of shop  No4. Gas cleanings furnace No 42
76 Engineering design supervision

2017-2018

Zaporozhstal, PJSC, Ukraine Zaporozhstal PJSC Agglomerative shop. Modernization of No1 sinter machine with the burners which use mixed gas
77 Development of the detailed project

2017-2018

Zaporozhye iron ore plant , PrJSC, Ukraine Zaporozhye iron ore plant PrJSC

Crushing and screening plant. Reconstruction of the headroom building. Replacing the existing GIT screens. Construction reinforcement

78 Development of the detailed project

2017-2018

Dneprospetsstal, PrJSC, Ukraine Modernization of water control system
79 Development of the detailed project

2017-2018

RPE Dneproenergostal, LLC, Ukraine PrAT Poltavskyi GZK . The crushers and concentrating factory. Constructions of a concentrate closed warehouse of a, a concentration unit, a building of a filtration  with a compressor station, a shiping point of concentrate to railway cars and a system of pulp conduits
80 Development of the detailed project

2017-2018

Azovstal IRON AND STEEL WORKS, PrJSC, Ukraine Rail and beam shop. Replacement of the thyristor converters of the drive of rolling motors of mill
81 Development of the detailed project

2017-2018

Metinvest Engineering, LLC, Ukraine ILYICH IRON AND STEEL WORKS

Reconstruction of gas cleaning systems of sintering machines No 1-12 (sintering zone) and reconstruction of outdated gas cleaning systems of sintering machines  No 7-12 (cooling zone)

82 Engineering design supervision

2018

Metinvest Engineering LLC, Ukraine ILYICH IRON AND STEEL WORKS

Reconstruction of gas cleaning systems of sintering machines No 1-12  (sintering zone) and reconstruction of outdated gas cleaning systems of sintering machines  No 7-12 (cooling zone)

83 Development of the detailed project

2018

Metinvest Engineering, LLC, Ukraine ILYICH IRON AND STEEL WORKS

Reconstruction of the roughing mill group of 1700 LPC-1700  broadband mill

 

84 Development of the detailed project

2017-2018

MIKEM, LLC, Ukraine Zaporozhstal PJSC

Oxygen compressor shop. Automatic throttle control system for six K-1500 compressors and a device for K-500 compressor No. 13. Modernization

85 Development of the detailed project

2018

ZKZ, PrJSC, Ukraine Production modernization. Organization of production of self-supporting insulated wires in the Central Electric Networks of ZKZ PrJSC
86 Development of the detailed project

2018

Dnepropress steel, LLC, Ukraine Steel shop. The installation of induction furnaces and the converter. Reconstruction.
87 Development of the detailed project

2018

Dnepropress steel, LLC, Ukraine Steel shop. Restored furnace DSPPT-12 and GKR-15 converter. Reconstruction
88 Engineering design supervision

2018-2019

Metinvest Engineering, LLC Detailed design of the project “Reconstruction of the roughing mill group of  1700 LPC 1700 wideband mill. ILYICH IRON AND STEEL WORKS
89 Development of the detailed project.

2018-2019

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant

Reconstruction of gas cleanings furnaces of No41-48 of shop No4. Gas cleaning furnace №43. Aksu Ferroalloy plant
90 Design supervision.

2018-2019

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aktobe  Ferroalloy plant

Engineering design supervision. Construction of car-freezers, installation of gas panels of infrared heating in the storage warehouse MV02 and installation of magnetic-pulse production plants in the drying department of raw materials MV04. Aktobe Ferroalloy Plant.
91 Development of the detailed project.

2019

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant

  Design estimate documentation for the installation of ferroalloy gas heating ladle in No6 smelting shop on furnaces which producing high-carbon ferrochrome.
92 Design supervision.

2019

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant

Expansion of the building of the foundry span and SHP of workshop No. 1
93 Detailed project

2019

Metinvest Engineering, LLC,

Termokimik Corporation, Ukraine

Work on the development of sections of the project documentation for the stage. working documentation for desulfurization facilities of sinter block no. 1 of sintering machines no. 1-6 of the cooling zone as part of the project“ reconstruction of gas cleaning systems of sintering machines no. 1-12 (sintering zone) and reconstruction of obsolete gas cleaning systems of sintering machines no. 7- 12 (cooling zone)/ ILYICH IRON AND STEEL WORKS
94 Settlement services.

2019

The Republic of Kazakhstan. TNC Kazchrome JSC.

Aksu Ferroalloy plant

Calculation of the bearing capacity of the columns of axes 34 and 37 in series B of workshop No. 1 Aksu Ferroalloy plant.
95 Engineering design supervision

2019

Metinvest Engineering, LLC, Ukraine Reconstruction of gas cleaning systems for sinter machines No. 1-6 of the cooling zone, as part of the project “Reconstruction of gas cleaning systems for sinter machines No. 1-12 (sintering zone) and reconstruction of obsolete gas cleaning systems for sinter machines No. 7-12. ILYICH IRON AND STEEL WORKS
96 Development of sections “Project” and “Working documentation”, 2019 Metinvest Engineering, LLC,

Primetals Technologies, Ukraine

Development of sections of project documentation for the Project and Work documentation stages as part of the project Reconstruction of a group of draft stands of a broadband mill 1700 LPC-1700.

New calendar plan. ILYICH IRON AND STEEL WORKS

97 Engineering design supervision,

2019

Metinvest Engineering, LLC, Ukraine Architectural supervision of construction and installation works (sections of the Working Documentation) within the framework of the project “Reconstruction of the group of draft stands of the broadband mill 1700 LPC-1700 of ILYICH IRON AND STEEL WORKS
98 Development of sections of the project, 2019 Metinvest Engineering, LLC, Ukraine Work on the development of design estimates for the Project stage in the sections: “Energy supply”, “Number of jobs and their equipment, total number of employees”, “Architectural and construction solutions”, “Engineering protection of territories and objects”, “Labor protection”, “ Water supply and drainage ”,“ Fire safety ”,“ Engineering and technical measures of civil protection (civil defense) ”,“ Hydraulics and lubrication systems ”,“ Waste management ”,“ Heating, ventilation and air conditioning ”,“ Ensuring reliability and safety spine of construction projects “,” Communication systems and industrial television “,” Identification of high-risk “in the framework of the project” Construction of hydraulic winder in

ILYICH IRON AND STEEL WORKS

99 Development of the detailed project, 2019 UKRGRAFIT, PJSC, Ukraine Implementation of the working draft: “Construction of a building for the installation of an extractive gas analyzer unit for continuous monitoring of exhaust gases, at the address: Zaporozhye, st. Northern highway, 20, UKRGRAFIT PJSC
100 Engineering design supervision,

2019

Zaporozhye machine-building design bureau Progress state enterprise named after academician A.G.Ivchenko, Ukraine Implementation of the supervision of the construction of the facility. Overhaul of the facade of building 132 with insulation
101 Engineering design supervision

2019,

ZAPOROZHCOKE, PJSC, Ukraine Implementation of architectural supervision of the construction of the facility: ZAPOROZHKOKE PJSC. Resin distillation workshop. Pitch granulation department No. 2. New construction. ” Extension of the term of Implementation of the supervision.
102 Development of the detailed project, 2019 Municipal enterprise Management of capital construction”, Ukraine Implementation of a working project at the facility: “Reconstruction of the sewer collector to KNS-1 on Ukrainian Zaporozhye St. (correction)”.
103 Engineering design supervision

2019,

Metinvest Engineering, LLC, Ukraine Architectural supervision of construction and installation works (sections of the Working documentation) “Architectural and construction part”, “Energy systems of water supply and sanitation, heating, ventilation and air conditioning systems”, “Electrical part, fire and security alarms” as part of the project “Reconstruction sinter gas cleaning systems No. 1-12 (sintering zone) and reconstruction of obsolete sinter gas cleaning systems No. 7-12 (cooling zone). ILYICH IRON AND STEEL WORKS
104 Development of the detailed project and design documentation,

Inspection, assessment of technical condition.

2019

TITANIUM INSTITUTE, PJSC, Ukraine

 

Implementation of the project and working documentation of the master plan and transport (GPT), urban planning calculation for the facility: ALOINS LLC. Reconstruction of the finished goods warehouse in Zaporozhzhia on the street. Teplichna, 7.

Survey, assessment of the technical condition and operational suitability of the foundations of the stock of materials of charge for the facility: ALOINS LLC Reconstruction of the charge warehouse and finished products for the charge preparation workshop. “

105 Development of the detailed project, 2019 Dnepropress steel, LLC, Ukraine Steel shop. Installation of the DSPPT-12 furnace and GOR-15 converter. Technical re-equipment.
106 Development of the detailed project, 2019 Dnepropress steel, LLC, Ukraine Steel shop. Installation of induction furnaces OIF1,0, OIF-1,5 and converter GOR-2.5.
107 Development of the detailed project, 2019 Ferroks, LLC, Ukraine Implementation of a working draft for the reconstruction of the smelter of Ferroks LLC , Zaporizhzhia, vul. Pivdenne chosse, 59
108 Calculation and design documentation PRACTICER, LLC , Ukraine Calculation and design documentation for brittle coupling for aerodrome signs
109 Design documentation , 2019 Zaporizhzhya Iron Ore Plant PJSC, Ukraine The overhead building of the central civil registration department of the ZIORP PJSC. Installation of the elevator on the GS-2. Working documentation
110 Development of design estimates, 2019 Financing of infrastructure projects SE, Ukraine GBN G.1-218-182: 2011 “Overhaul (device) of traffic interchange at the same level of ring type with a small diameter of the central island on a public highway of national importance M-18 Kharkiv-Simferopol-Alushta-Yalta on the km 263+120, Zaporizhzhia Region ”(development of design and estimate documentation for the overhaul of roads, engineering structures and its examination) (code DK 021: 2015 (45000000-7 – Construction work and current repair)
111 Development of the design documentation, 2019 Financing of infrastructure projects SE, Ukraine GBN G.1-218-182: 2011 “Overhaul (device) of transport interchange at the same ring type with the average diameter of the central island on a public highway of national importance N-30 Vasylivka-Berdyansk on the section km 39+166, Zaporizhzhia region “(Development of design estimates for the overhaul of roads, engineering structures and its examination)
112 Development of the design documentation, 2019 Financing of infrastructure projects SE, Ukraine GBN G.1-218-182: 2011 “Overhaul (device) of traffic interchange at the same level of ring type with a small diameter of the central island on a public highway of national importance M-18 Kharkiv-Simferopol-Alushta-Yalta on the km 376+866, Zaporizhzhia region ”(development of design estimates for the overhaul of roads, engineering structures and its examination)
113 Development of the design documentation, 2019 Financing of infrastructure projects SE, Ukraine GBN G.1-218-182: 2011 “Overhaul (device) of transport interchange at the same level of ring type with a small diameter of the central island on a public highway of national importance R-37 Energodar-Vasylivka on the section km 13+940, Zaporizhzhia region “(Development of design estimates for the overhaul of roads, engineering structures and its examination)