Nr |
Design lead time |
Customer |
Design Description |
1 |
Development of a working draft. 2008-2010г |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Agglomeration factory with an agglomerate capacity of 350 thousand tons per year at the Aksu Ferroalloy Plant |
2 |
Development of the detailed project, design monitoring |
Zaporozhcran, PJSC, Ukraine |
Ukraine, Zaporozhcran PJSC, |
3 |
Development of the detailed project, design monitoring, Expertise |
РJSC ArcelorMittal Kryvyi Rih, Ukraine |
РJSC ArcelorMittal Kryvyi Rih, |
4 |
Development of the detailed project and design monitoring |
Zaporozhstal, PJSC, Ukraine |
Ukraine, Zaporozhstal PJSC, |
5 |
Development of the detailed project and design monitoring |
Zaporozhstal, PJSC, Ukraine |
Casting shop. |
6 |
Development of the detailed project and design monitoring |
Zaporozhstal, PJSC, Ukraine |
Oxygen compressor shop. Installation of the air separation unit of capacity 60 000 m3/h |
7 |
Development of the detailed project and design monitoring |
ZAPOROZHCOKE, PJSC, Ukraine |
Ukraine, Zaporozhcoke PJSC |
8 |
Development of the detailed project and design monitoring |
РJSC ArcelorMittal Kryvyi Rih, Ukraine |
Open-hearth shop. Reconstruction of the gas purification unit of mixer No. 2 |
9 |
Development of the detailed project and design monitoring |
РJSC ArcelorMittal Kryvyi Rih, Ukraine |
Sintering shop No. 3. |
10 |
Development of a working draft |
The Republic of Kazakhstan. |
Gravity hot water pipelines of workshops No. 2 and No. 4 to СРS-1 of the Aksu Ferroalloy Plant |
11 |
Development of the detailed project and design monitoring |
Dneprospetsstal, PJSC, Ukraine |
Ukraine, Dneprospetsstal PJSC, Installation of DSP-60 furnace with the gas purification unit |
12 |
Development of the detailed project, design monitoring, Expertise |
Dneprospetsstal, PJSC, Ukraine |
Reconstruction of gas purifying system No. 3 electric steel-making shop |
13 |
Development of the detailed project and design monitoring |
Semi-conductor plant, PJSC, Ukraine |
Semi-conductor plant PrJSC, |
14 |
Development of the detailed project and commissioning |
Motor Sich, PJSC, Ukraine |
Motor Sich PJSC |
15 |
Development of the detailed project and design monitoring. |
The Republic of Kazakhstan. |
Reconstruction of gas treatment system of shop No. 4. Gas cleanings furnace No. 41, 45, 46 |
16 |
Development of the detailed project and design monitoring |
Electrozavod, OJSC, Moscow, |
Electrozavod OJSC |
17 |
Development of the detailed project and design monitoring |
KOLOROVI METALY LTD WITH FOREIGN INVESTMENTS, Ukraine |
Gravity ore-processing plant |
18 |
Development of the detailed project and design monitoring |
Zaporozhye Cable Plant PJSC, Ukraine |
Zaporozhye Cable Plant PJSC |
19 |
Development of the detailed project, design monitoring, Expertise 2011 |
Dneprospetsstal, PrJSC, Ukraine |
Reconstruction of the recycling water supply of steelmaking and rolling shops |
20 |
Development of the detailed project and design monitoring. 2011 |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Boiler house for Sintering plant. |
21 |
Development of the detailed project and design monitoring |
РJSC “ArcelorMittal Kryvyi Rih”, Ukraine |
Blast-furnace shop No. 1. Refractory preparation department. Reconstruction of aspiration system |
22 |
Development of the detailed project |
Dneprometiz, PJSC. Ukraine |
Modernization of steel-wire shop No. 2. Installation of the bell-type furnace |
23 |
Development of the detailed project, design monitoring, Expertise 2011-2012 |
Dneprospetsstal PJSC, Ukraine |
Modernization of casting-form for ferromolybdenum production |
24 |
Development of the detailed project and design monitoring |
Ferrotreiding PrJSC, Ukraine |
Ferrotreiding PrJSC |
25 |
Development of the detailed projects2011-2016 |
UKS Municipal Enterprise, Ukraine |
Zaporozhye transport network modernization |
26 |
Development of the detailed project and design monitoring |
Zaporozhstal, PJSC, Ukraine |
Zaporozhstal, PJSC |
27 |
Development of working documentation. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Reconstruction of ventilation, heating, heat and cold supply and air conditioning systems at the Business Center of TNK Kazchrome JSC |
28 |
Development of the detailed project and design agreement |
Energoatom NAEK, Ukraine |
Atomenergomash. |
29 |
Development of the detailed project |
Zaporozhstal, PJSC, Ukraine |
Sixteen story house design |
30 |
Development of the detailed project and design monitoring |
Zaporozhstal, PJSC, Ukraine |
Cold rolling shop. Pickling line |
31 |
Development of the detailed project. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
The department of drying chrome ore and coke for the sinter production. |
32 |
Development of the feasibility Study documentation |
РJSC ArcelorMittal Kryvyi Rih, Ukraine |
Crushing factory. |
33 |
Development of the detailed engineering and turnkey project in cooperation with “Air Liquide” |
AIR LIQUIDE Company, |
AIR LIQUIDE ENAKIEVO PrJSC, |
34 |
Development of the detailed project and design monitoring |
RPA Dnipropress, PrJSC, |
RPA Dnipropress PrJSC. Installation of the converter with a capacity of 15 tons in the steel-making shop |
35 |
Development of the detailed project and design monitoring |
Zaporozhstal, PJSC, Ukraine |
Cold rolling Shop. Reconstruction of the emulsion system of the Tandem mill |
36 |
Development of the detailed project and design monitoring |
Zaporozhstal, PJSC, Ukraine |
Blast shop. Dust blown fuel. Basic coal storage |
37 |
Development of the detailed engineering 2013 |
TITANIUM INSTITUTE, PJSC, Ukraine |
Ferronickel Production. |
38 |
Development of the detailed project |
State-run enterprise Iskra, Ukraine |
Plating shop. Installation of the zinc-platingline |
39 |
Development of the detailed project |
Dneprosplav plant, LLC, Ukraine |
Modernization of the ferrous and non-ferrous metals processing shop |
40 |
Development of the detailed project |
Prosco Resources, LLC, Ukraine |
Wet and chemical enrichment plant. Installation of centrifuges and vibrating screens |
41 |
Development of the detailed project |
Cemkomplekt, LLC, Ukraine |
Kryvyi Rih Thermal Power Station. Reconstruction of the ashremoval system out of the electric filters of 300MW powerunits |
42 |
Development of the TEO documentation of the gas-turbine plant |
Motor Sich, PJSC, Ukraine |
Gas turbine unit with a capacity of 2.5 MW with on low-calorie fuel |
43 |
Development of the detailed project. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Brecks production. Aktyubinsk Ferro-alloy plant |
44 |
Correction of the detailed design |
ZAPOROZHCOKE, PJSC, Ukraine |
Coal preparation department |
45 |
Development of the detailed project |
РJSC ArcelorMittal Kryvyi Rih, Ukraine |
РJSC ArcelorMittal Kryvyi Rih. Reconstruction of sintering shop No. 2. Sinter machine No. 6. |
46 |
Design and turnkey project in cooperation with RPE Dneproenergostal, LLC |
Zaporozhstal, PJSC, Ukraine |
Zaporozhstal PJSC. Sintering shop. Reconstruction of gas cleaning sinter machine No. 2 |
47 |
Development of the detailed project and Expertise |
Tokmak Solar Energy, LLC, Ukraine |
Solar power station 50 MW |
48 |
Development of the detailed project and Expertise |
ZAPOROZHCOKE, PJSC, Ukraine |
Coke shop. Reconstruction of the coke screening line |
49 |
Development of the detailed project and design agreement |
ZAPOROZHCOKE, PJSC, Ukraine |
Coke sorting. Reconstruction of the ventilation and aspiration system |
50 |
Development of the detailed project |
ZAPOROZHCOKE, PJSC, Ukraine |
Replacing heat exchangers |
51 |
Development of the detailed project |
Maclife-Asu, LLC, Ukraine |
Centroenergo PJSC. Tripolskaya Thermal Power Station. Installation of equipment for the selection of dry ash on 1 ÷ 4 blocks |
52 |
Development of the detailed project and Expertise |
Ukrgrafit, PJSC, Ukraine |
Reconstruction of Graphite substation 150/6 kV with the replacement of transformers |
53 |
Development of the detailed project |
Zaporozhtransformator, PJSC, Ukraine |
Modernization of the oil and oil waste treatment system |
54 |
Design and turnkey project in cooperation with Progress Grupp LLC |
Zaporozhstal, PJSC, Ukraine |
Zaporozhstal OJSC. Agglomerative shop. Reconstruction of |
55 |
Development of the TEO documentation |
Ukrgrafit, PJSC, Ukraine |
Railway routing and river port railway communication development |
56 |
Development of the detailed project and design agreement |
Energy service, LLC, Ukraine |
Kremenchug Thermal Power Station. Replacing TG-1excitation instead of the thyristor excitation system |
57 |
Development of the detailed project and design agreement |
ABC Holding, LLC, Ukraine |
Southwestern Railway. Modernization of the traction substation 110/27 / 11kV |
58 |
Development of the detailed project and Expertise |
EuroCape Ukraine LLC, |
Wind park of capacity 500 MW on the area of Priazovskeand Melitopol district of Zaporozhye region |
59 |
Development of the detailed project |
Zaporozhstal, PJSC, Ukraine |
Zaporozhstal OJSC Conversion of hearths of sintering machines No. 2-6 to mixed gas |
60 |
Development of the detailed project and design agreement |
Dneprospetsstal, PrJSC, Ukraine |
Сonversion of thermal furnaces to natural gas |
61 |
Development of the detailed project. |
Metinvest Engineering, LLC, Ukraine |
Reconstruction of the rail and structural department of AZOVSTAL IRON & STEEL WORKS. |
62 |
Development of working documentation. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Development of design estimates and detailed engineering of equipment for the production of low-carbon ferrochrome by the mixing method in shop No 4 of the Aksu Ferroalloy Plant |
63 |
Development of the detailed project. 2016 г. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Industrial gas cleaning facilities of furnace No. 44 of shop No. 4. |
64 |
Development of the detailed project. |
Kotloenergoproject HKP PrJSC, Ukraine |
Installing the Thermal Power Station boiler |
65 |
Development of the TEO documentation |
Dneprospetsstal, PrJSC,, Ukraine |
Reconstruction of the electric steel-smelting shop No 5 with the installation of VDP and VIP furnaces |
66 |
Development of the TEO documentation |
Zaporizʹkyy Abrazyvnyy Kombinat, PrJSC, Ukraine |
Reactive power compensation in plant networks |
67 |
Development of the detailed project |
Plavmet, LLC, Ukraine |
Modernization of the remelting of non-ferrous metals department |
68 |
Development of the detailed project |
Zaporozhye machine-building design bureau progress state enterprise named after academician A.G.Ivchenko , Ukraine |
Building No. 132. Conference rooms Reconstruction |
69 |
Development of the detailed project |
Zaporozhye OblEnergo, OJSC, Ukraine |
Expansion of Naberezhnaya substation 35/6 kV |
70 |
Development of the detailed project and design agreement |
Tehnova Chernigov TPP PJSC, Ukraine |
Replacement of thyristor excitation system instead of turbine generators motor-driven exciters |
71 |
Implementation of supervision on the object. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Object “Experimental industrial site for the production of breaks in the amount of 80 thousand tons per year by extrusion. |
72 |
Development of the detailed project. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Development of design for the expansion of the building of the foundry span and No 1 shop of Aksu Ferroalloy plant |
73 |
Development of the detailed project. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Designing the 2nd stage of the GPP-2. Aksu Ferroalloy Plant |
74 |
Development of the detailed project. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Construction of railway car defrosters, installation of gas infrared heating panels in a storage warehouse MV02 and installation of magnetic-pulse units in the drying department of raw materials MV04. Aktobe Ferroalloy Plant. |
75 |
Development of the detailed project. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Reconstruction of gas cleanings furnaces No. 41-48 of shop No. 4. Gas cleanings furnace No. 42 |
76 |
Engineering design supervision |
Zaporozhstal, PJSC, Ukraine |
Zaporozhstal PJSC Agglomerative shop. Modernization of No. 1 sinter machine with the burners which use mixed gas |
77 |
Development of the detailed project |
Zaporozhye iron ore plant , PrJSC, Ukraine |
Zaporozhye iron ore plant PrJSC |
78 |
Development of the detailed project |
Dneprospetsstal, PrJSC, Ukraine |
Modernization of water control system |
79 |
Development of the detailed project |
RPE Dneproenergostal, LLC, Ukraine |
PrAT Poltavskyi GZK . The crushers and concentrating factory. Constructions of a concentrate closed warehouse of a, a concentration unit, a building of a filtration with a compressor station, a shiping point of concentrate to railway cars and a system of pulp conduits |
80 |
Development of the detailed project |
Azovstal IRON AND STEEL WORKS, PrJSC, Ukraine |
Rail and beam shop. Replacement of the thyristor converters of the drive of rolling motors of mill |
81 |
Development of the detailed project |
Metinvest Engineering, LLC, Ukraine |
ILYICH IRON AND STEEL WORKS |
82 |
Engineering design supervision |
Metinvest Engineering LLC, Ukraine |
ILYICH IRON AND STEEL WORKS |
83 |
Development of the detailed project |
Metinvest Engineering, LLC, Ukraine |
ILYICH IRON AND STEEL WORKS |
84 |
Development of the detailed project |
MIKEM, LLC, Ukraine |
Zaporozhstal PJSC |
85 |
Development of the detailed project |
Zaporozhye Cable Plant, PrJSC, Ukraine |
Zaporozhye Cable Plant, PrJSC, Production modernization. Organization of production of self-supporting insulated wires in the Common Use Center No.121 |
86 |
Development of the detailed project |
Dnepropress steel, LLC, Ukraine |
Steel shop. The installation of induction furnaces and the converter. Reconstruction. |
87 |
Development of the detailed project |
Dnepropress steel, LLC, Ukraine |
Steel shop. Restored furnace DSPPT-12 and GKR-15 converter. Reconstruction |
88 |
Engineering design supervision |
Metinvest Engineering, LLC |
Detailed design of the project Reconstruction of roughing stands in 1700 hot strip mill. |
89 |
Development of the detailed project. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Reconstruction of gas cleanings furnaces of No. 41-48 of shop No. 4. Gas cleaning furnace No. 43. Aksu Ferroalloy plant |
90 |
Design supervision. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Engineering design supervision. Construction of car-freezers, installation of gas panels of infrared heating in the storage warehouse MV02 and installation of magnetic-pulse production plants in the drying department of raw materials MV04. Aktobe Ferroalloy Plant. |
91 |
Development of the detailed project. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Design estimate documentation for the installation of ferroalloy gas heating ladle in No6 smelting shop on furnaces which producing high-carbon ferrochrome. |
92 |
Design supervision. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Expansion of the building of the foundry span and SHP of workshop No. 1 |
93 |
Detailed project |
Metinvest Engineering, LLC, |
Development of sections of the project documentation for the stage Working documentation for desulfurization facilities of sinter block No. 1 of sintering machines no. 1-6 of the cooling zone as part of the project“ reconstruction of gas cleaning systems of sintering machines no. 1-12 (sintering zone) and reconstruction of obsolete gas cleaning systems of sintering machines No. 7- 12 (cooling zone)/ ILYICH IRON AND STEEL WORKS |
94 |
Settlement services. |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Calculation of the bearing capacity of the columns of axes 34 and 37 in series B of workshop No. 1 Aksu Ferroalloy plant. |
95 |
Engineering design supervision |
Metinvest Engineering, LLC, Ukraine |
Reconstruction of gas cleaning systems for sinter machines No. 1-6 of the cooling zone, as part of the project “Reconstruction of gas cleaning systems for sinter machines No. 1-12 (sintering zone) and reconstruction of obsolete gas cleaning systems for sinter machines No. 7-12. ILYICH IRON AND STEEL WORKS |
96 |
Development of sections “Project” and “Working documentation”, 2019 |
Metinvest Engineering, LLC, |
Development of sections of project documentation for the Project and Work documentation stages as part of the project Reconstruction of roughing stands in 1700 hot strip mill. |
97 |
Engineering design supervision, |
Metinvest Engineering, LLC, Ukraine |
Architectural supervision of construction and installation works (sections of the Working Documentation) in according to the project Reconstruction of roughing stands in 1700 hot strip mill. |
98 |
Development of sections of the project, 2019 |
Metinvest Engineering, LLC, Ukraine |
Work on the development of design estimates for the Project stage in the sections: “Energy supply”, “Number of jobs and their equipment, total number of employees”, “Architectural and construction solutions”, “Engineering protection of territories and objects”, “Labor protection”, “Water supply and drainage”, “Fire safety”, “Engineering and technical measures of civil protection (civil defense)”, “Hydraulics and lubrication systems”, “Waste management ”, “Heating, ventilation and air conditioning”, “Ensuring reliability and safety spine of construction projects”, “Communication systems and industrial television”, “Identification of high-risk” in the framework of the project” Construction of hydraulic winder at the |
99 |
Development of the detailed project, 2019 |
UKRGRAFIT, PJSC, Ukraine |
Implementation of the detailed design: |
100 |
Engineering design supervision, |
Zaporozhye machine-building design bureau Progress state enterprise named after academician A.G.Ivchenko, Ukraine |
Implementation of the facility supervision. Overhaul of the facade of building No.132 with insulation |
101 |
Engineering design supervision |
ZAPOROZHCOKE, PJSC, Ukraine |
Implementation of the facility supervision. ZAPOROZHKOKE PJSC. Resin distillation workshop. Pitch granulation department No. 2. New construction. Extension of the term of Implementation of the supervision. |
102 |
Development of the detailed project, 2019 |
Municipal enterprise Management of capital construction, Ukraine |
Implementation of a working project at the facility: “Reconstruction of the sewer collector to KNS-1 by vul. Ukrainska, Zaporizhzhia (correction)”. |
103 |
Engineering design supervision |
Metinvest Engineering, LLC, Ukraine |
Architectural supervision of construction and installation works (sections of the Working documentation) “Architectural and construction part”, “Energy systems of water supply and sanitation, heating, ventilation and air conditioning systems”, “Electrical part, fire and security alarms” as part of the project “Reconstruction sinter gas cleaning systems No. 1-12 (sintering zone) and reconstruction of obsolete sinter gas cleaning systems No. 7-12 (cooling zone). ILYICH IRON AND STEEL WORKS |
104 |
Development of the detailed project and design documentation, |
TITANIUM INSTITUTE, PJSC, Ukraine |
Implementation of the project and working documentation of the master plan and transport (GPT), urban planning calculation for the facility: ALOINS LLC. Reconstruction of the finished goods warehouse in Zaporozhzhia on the vul. Teplichna, 7. |
105 |
Development of the detailed project, 2019 |
Dnepropress steel, LLC, Ukraine |
Steel shop. Installation of the DSPPT-12 furnace and GKR-15 converter. Technical re-equipment. |
106 |
Development of the detailed project, 2019 |
Dnepropress steel, LLC, Ukraine |
Steel shop. Installation of induction furnaces OIP-1,0, OIP-1,5 and converter GKR-2.5. |
107 |
Development of the detailed project, 2019 |
Ferroks, LLC, Ukraine |
Implementation of a working draft for the reconstruction of the smelter of Ferroks LLC, vul. Pivdenne shose, 59, Zaporizhzhia |
108 |
Calculation and design documentation |
PRACTICER, LLC , Ukraine |
Calculation and design documentation for brittle coupling for aerodrome signs |
109 |
Design documentation , 2019 |
Zaporizhzhya Iron Ore Plant PJSC, Ukraine |
Zaporizhzhya Iron Ore Plant PJSC. |
110 |
Development of design estimates, 2019 |
Financing of infrastructure projects SE, Ukraine |
GBN G.1-218-182: 2011 “Overhaul of traffic interchange at the same level of ring type with a small diameter of the central aria on national road M-18 Kharkiv-Simferopol-Alushta-Yalta on the km 263+120, Zaporizhzhia region” (development of design and estimate documentation for the overhaul of roads, engineering structures and its examination) (code DK 021: 2015 (45000000-7 – Construction work and current repair) |
111 |
Development of the design documentation, 2019 |
Financing of infrastructure projects SE, Ukraine |
GBN G.1-218-182: 2011 “Overhaul of transport interchange at the same ring type with the average diameter of the central aria on national road N-30 Vasylivka-Berdyansk on the section km 39+166, Zaporizhzhia region” (Development of design estimates for the overhaul of roads, engineering structures and its examination) |
112 |
Development of the design documentation, 2019 |
Financing of infrastructure projects SE, Ukraine |
GBN G.1-218-182: 2011 “Overhaul of traffic interchange at the same level of ring type with a small diameter of the central aria on national road M-18 Kharkiv-Simferopol-Alushta-Yalta on the km 376+866, Zaporizhzhia region” (development of design estimates for the overhaul of roads, engineering structures and its examination) |
113 |
Development of the design documentation, 2019 |
Financing of infrastructure projects SE, Ukraine |
GBN G.1-218-182: 2011 “Overhaul of transport interchange at the same level of ring type with a small diameter of the central aria on national road R-37 Energodar-Vasylivka on the section km 13+940, Zaporizhzhia region” (Development of design estimates for the overhaul of roads, engineering structures and its examination) |
114 |
Inspection and assessment of technical condition, 2019 |
Metinvest Engineering, LLC, Ukraine |
Inspection and assessment of the technical condition of the existing foundations of VRU-60 booster-compressors as a part of the project “Construction of hot-rolled coils production” in Zaporozhye, Yuzhnoe shosse St., 72 |
115 |
Development of the detailed project, 2019 |
PJSC Zaporozhye Cable Plant, Ukraine |
PJSC Zaporozhye Cable Plant. Production modernization. Organization of production of self-supporting insulated wires in the Common Use Center No. 121 |
116 |
Development of the detailed project, 2019-2020 |
Metinvest Engineering, LLC, Ukraine |
Development of the detailed project for desulfurization facilities of sinter casing No. 1 of sinter machines No. 1-6 of the cooling zone for the project Reconstruction of gas cleaning systems of sinter machines No. 1-12 (sintering zone) and reconstruction of outdated gas cleaning systems of sinter machines No. 7-12 (cooling zone) at PJSC ILYICH IRON AND STEEL WORKS |
117 |
Development of the detailed project, 2019-2020 |
PJSC Zaporozhye iron ore plant, Ukraine |
PJSC Zaporozhye iron ore plant. |
118 |
Development of detailed structural steel drawings, 2019-2020 |
Metinvest Engineering, LLC, Ukraine |
Development of detailed structural steel drawings for desulfurization facilities sinter casing No. 1 of sinter machines No. 1-6 cooling zones of the stage Development of the detailed project for the project Reconstruction of gas cleaning systems for sintering machines No. 1-12 (sintering zone) and reconstruction of outdated gas cleaning systems for sintering machines No. 7-12 (zone cooling) at PJSC ILYICH IRON AND STEEL WORKS |
119 |
Design estimate documentation and |
Metinvest Engineering, LLC, Ukraine |
Development of design and estimate documentation for the project Construction of a hydraulic coiler in 1700 hot strip mill of PJSC ILYICH IRON AND STEEL WORKS in Mariupol, Levchenko st., 1 |
120 |
Development and adaptation of an investment project, 2020 |
The Republic of Kazakhstan, JSC ArcelorMittal Temirtau |
JSC ArcelorMittal Temirtau, |
121 |
Development of the project, 2019 |
The Republic of Kazakhstan. JSC TNC Kazchrome. |
Aksu Ferroalloy Plant – a branch of JSC TNK Kazchrome |
122 |
Design estimate documentation |
LLC ERG Recycling |
The Republic of Kazakhstan, Pavlodar region, Aksu-1, Aksu ferroalloy plant as a branch of the JSC TNK Kazchrome, |
123 |
Design estimate documentation 2021 |
TsentrEnergoAlliance LLC |
No. 1 Smelting shop. Reconstruction. Installation of 22 MVA ore-thermal electric furnace RKO-22FKh-I2 of Aktobe Ferroalloys Plant, which is a branch of TNK Kazchrome JSC |
124 |
Engineering design supervision |
The Republic of Kazakhstan. TNC Kazchrome JSC |
Supervision of the desing project: Jigging complex insulation with the heat pumps installation for heating by circulating water from the cooling elements of smelting furnaces of shop No. 1 of the Aksu Ferroalloys Plant which is a branch of TNK Kazchrome JSC. |
125 |
Design estimate documentation 2021 |
The Republic of Kazakhstan. TNC Kazchrome JSC |
Development of design and estimate documentation for the project “Sector of ladle lining with carbon raw materials for the Aksu Ferroalloys Plant which is a branch of TNK Kazchrome JSC |
126 |
Engineering design supervision, |
Mistsevi dorohy Zaporizkoi oblasti |
Supervision during construction work performance of the object: |
127 |
Project development, |
Vodokanal |
Work execution according to Code DK 021: 2015 45220000-5 Engineering and construction work (project development and obtaining a positive report from expert by the project “Reconstruction of a water conduit from DVS-1 to s. Liutserna, Vilniansk raion, Zaporizhzhia oblast) |
128 |
Development of the design documentation, |
Metinvest Engineering, LLC, Ukraine |
Work execution of design documentation for three stages: concept of design, design development, detailed documentation within the project: “Reconstruction of the aspiration system of the stock house of the skip pit and bell-less top of No. 4 blast furnace PJSC “AZOVSTAL IRON & STEEL WORKS” |
129 |
Engineering design supervision, |
Metinvest Engineering, LLC, Ukraine |
Supervision of engineering and construction work according to detailed documentation of the project: “Reconstruction of the aspiration system of the stock house of the skip pit and bell-less top of No. 4 blast furnace PJSC “AZOVSTAL IRON & STEEL WORKS” at address Leporskogo st. 1, Mariupol city |
130 |
Correction of design documentation, |
Capital construction management |
Correction of the design documentation for the object: Reconstruction of the chlorination plant of DVS-2, Zaporizhzhia city (second stage, correction) |
131 |
Development of design documentation, 2021 |
ZAPORIZHZHIA MACHINE-BUILDING DESIGN BUREAU PROGRESS STATE ENTERPRISE NAMED AFTER ACADEMICIAN O.H.IVCHENKO |
Development of design documentation for overhaul of the facade with insulation of No. 132 building in axes U-A, axis 1/5 (south side) at the address Ivanova st. 2, Zaporizhzhia city |
132 |
Engineering services, |
Mykolaiv Alumina Plant TOV |
“Calcination sector. Technical re-equipment of the gas cleaning system at the unit KS-1 “Lurgi” of Mykolaiv Alumina Plant TOV at address vul. Naberezhna, bud. 64, s. Halytsynove, Vitovka raion, Mykolaivska obl.”(service code – 71.12.1 Engineering services) |
133 |
Engineering design supervision, |
Mykolaiv Alumina Plant TOV |
Supervision by the construction of the facility: “Calcination sector. Technical re-equipment of the gas cleaning system at the unit KS-1 “Lurgi” of Mykolaiv Alumina Plant TOV at address vul. Naberezhna, bud. 64, s. Halytsynove, Vitovka raion, Mykolaivska obl.” |
134 |
Detailed documentation development, |
Mykolaiv Alumina Plant TOV |
Development of detailed documentation for the project: “Construction of a new storage pond with a pumping station as a part of the technical re-equipment of slime facility with the transition to a new dry storage technology of red mud filter cake of Mykolaiv Alumina Plant TOV at address vul. Naberezhna, bud. 64, s. Halytsynove, Vitovka raion, Mykolaivska obl.”. Correction. Relocation of structures and networks from the construction zone |
135 |
Detailed documentation development, |
Mykolaiv Alumina Plant TOV |
Development of detailed documentation for the project: “Construction of a new storage pond with a pumping station as a part of the technical re-equipment of slime facility with the transition to a new dry storage technology of red mud filter cake of Mykolaiv Alumina Plant TOV at address vul. Naberezhna, bud. 6, s. Halytsynove, Vitovka raion, Mykolaivska obl.”. Correction. Relocation of structures and networks from the construction zone. Additional development of detailed documentation for the on-site road |
136 |
Engineering design supervision, |
‘Mariupolavtodor’ Commercial Public Utility |
Supervision of the overhaul of road network on Stroiteley Ave from Mira Ave to Black Sea alley in Mariupol city |
137 |
Correction of design documentation, |
Capital Construction Management |
Correction of the design documentation for the object: “Reconstruction of the chlorination plant of DVS-2, Zaporizhzhia city” (second stage, the correction) Change of particulars and amount of finance |
138 |
Inspection of structures |
Capital Construction Management |
Inspection of span structures for the object: “Reconstruction of span structures of Voznesenovsky spusk (Leninsky Komsomol) causeway on Pobedy st. to Yatsenko st. in Zaporozhye |
139 |
Development of the project, |
Capital Construction Management |
Reconstruction of under-bridge span structures of Voznesenovsky spusk (Leninsky Komsomol) causeway on Pobedy st. to Yatsenko st. in Zaporozhye. Adjustment |
140 |
Engineering design supervision, |
Metinvest Engineering, LLC, Ukraine |
Supervision of the project: “Reconstruction of the aspiration system of the stock house of the skip pit and bell-less top of No. 4 blast furnace PJSC “AZOVSTAL IRON & STEEL WORKS” on the Leporskogo st. 1, Mariupol city |
141 |
Design estimate documentation, 2021 |
METSPLAV TD LLC |
Design development stage for the object: Reconstruction. Installation of an induction furnace for smelting steel and other alloys. Production Company DNIPRO WORKS OF METAL ALLOYS LLC at address industrial site of the mine 11, Stepnohirsk city, Zaporizhzhia oblast, Ukraine |
142 |
Design estimate documentation, 2021 |
Melitopol turbo compressor plant LLC |
Design development stage for the object: Span reconstruction in axies B-V of the reinforcement shop into the foundry of casting according to gasifiable patterns of Melitopol turbo compressor plant LLC, Kakhovske shose st. 20a, Melitopol city |
143 |
Development of the design documentation, |
Poltava mining and refining plant |
Development of design documentation for the loading unit of conveyors which are working directly into the drum pelletizer. Design documentation |
144 |
Development of the detailed project, |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
TNK Kazchrome JSC. Aksu Ferro-Alloys Plant. Power shop of Aksu Ferro-Alloys Plant. Reconstruction of filter station No. 2 with replacement of coarse filters. Detail design |
145 |
Design estimate documentation, 2021 |
The Republic of Kazakhstan. TNC Kazchrome JSC. |
Development of design and estimate documentation for the project “Section of lining ladles with carbonaceous materials for Aksu Ferroalloys Plant which is a branch of TNK Kazchrome JSC” |
146 |
Design estimate documentation, 2021 |
TsentrEnergoAlliance, LLC |
Development of design and estimate documentation for the object: Smelting shop No. 1. Reconstruction. Installation of 22 MVA capacity ore-thermal electric furnace RKO-22FKh-I2 of Aktobe Ferroalloys Plant as a branch of TNK Kazchrome JSC |
147 |
Development of the detailed project, |
Metinvest Engineering, LLC, Ukraine |
Development of detailed documentation “New construction for the production of cold-rolled products at PJSC ILYICH IRON AND STEEL WORKS at address Levchenko st. 1, Mariupol city. Construction stage No.1 (CS-1). AMKOM-1 installation translocation” |
148 |
Development |
The Republic of Kazakhstan. |
Energy shop. Reconstruction of the filter station No. 2 with the replacement of coarse filters. Aksu Ferroalloy plant |
149 |
Development |
The Republic of Kazakhstan. |
Smelting workshop No. 1. Reconstruction. Replacement of furnace No. 12. Installation of ore-thermal electric furnace RKO-22FKh-I2 with a capacity of 22 MVA. |